Simple and easy to understand the order of renovation process rookie from here

With the improvement of people's living standards, more and more people are buying homes. After the house is collected, people generally have difficulty in fitting and do not know where to start. Many friends who do not have experience in house fitting are not very familiar with the decoration process and the order of the main materials for the decoration. Therefore, there is often a shortage of materials during the renovation process. Today, Xiao Bian gave everyone a complete decoration sequence process , ready to decorate friends, hurry up and see together!

Decoration sequence process

The first step: Demolition and reconstruction of the main body

The demolition of the main body is the first one to be put on the project. It mainly includes the demolition of walls, walls, shovels, removal of heat, replacement of steel windows, and so on. The garbage that has been demolished must be cleared out in time to ensure the cleanliness of the interior and it is also more convenient for future construction.

The second step: hydropower reform

Before the hydropower reform, the cabinet designer should come to the door to make the first measurement, help determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc., and formulate reconstruction plans. The water heater is also best to send people, according to your choice of model, design a good power, interface location. The air-conditioning and its power supply should be placed on the wall of the bedside as much as possible to avoid direct air-conditioning to the person.

The third step: paste wallpaper

The wallpaper is much better than the wall paint effect. After the wall paint is brushed, the oil trader will brush nitro-lacquer on the place where the wallpaper is to be applied, and the paint will dry out the next day. Then you can paste the wallpaper.

Step 4: Install the socket panel

The socket panel can be installed for about half a day. It should be noted that the socket is best bought with the switch function, especially the kitchen. In this way, the rice cooker and the microwave oven can avoid plugging and unplugging the power and can be controlled by the switch.

Step 5: Install Cabinets

Cabinets are a cooperating project and should be purchased in advance for range hoods, cooktops and sinks. It is best to send it on the same day and install it with the cabinet.

Step 6: Install the finished door

Finished doors should be installed before the floor. Mainly because of the complex installation steps, hinges, door locks, door stoppers, door frames, and so on, many tools are used, such as installing the floor first, and the bumps are difficult to avoid.

Step 7: Install Hardware

It is recommended that before the installation of the floor, the debris items that are scattered in the drying racks, curtain rods, lamps, sanitary ware, and sanitary ware should be installed one by one. If the procedures are reversed, it may cause damage to the floor.

Step 8: Install the floor

Before the floor is installed, it must be leveled. Workers must be required not to cut the floor in the house. They should be cut in the corridor so that they can clean the corridor.

In addition, there are many late accessories, such as curtain decorations and the like, these can basically be based on space and design style. These are only a rough order of home improvement, sometimes due to changes in the people, and some owners may not have determined the decoration time, the relevant main materials may be completed, and some owners are set up side decoration. In any case, it is important to make reasonable use of the main material to order and determine the delivery time.

The above is the process of renovation order, and it is hoped that you will be helpful in preparing the decoration. For more information on decoration, please continue to pay attention to the information on this site.

Decoration process

permanent magnetic chuckpermanent magnetic chucks

Permanent Magnetic Chuck

Permanent Magnetic Chuck,Magnetic Chuck,Electro Permanent Magnetic Chuck,Permanent Magnetic Grinder Chuck

NINGBO SHINE MAGENETIC TECHNOLOGY CO.,LTD , https://www.shinemagnets.com